STAMPA PAGINA PDF
Imposta scala stampa 75%
CHECKLIST PRJ - METODO EB Team
PROJECT DOC SYNOPTIC [CEI GUIDE 0-2:2025]

(3) If the work consists only in the construction of the EEC systems, it is generally the responsibility of the EEC systems designer (4) If foreseen in the tender notice or by agreements between the parties.
(4a) For private works, if agreed between the parties
(5) The specialist report is also recommended for condominium EEC systems with contracted power <= 6 kW (6) The system diagram is intended ((DM 37/08)
(7) the first draft must be done by the "design coordinator" with reference to the "Code"

