Check work equipment
Other services that we can offer through our partners are the checks of the earthing systems according to DPR462/01 and the checks of the elevators, if present, according to DRP162/99
SP Group Work Equipment - Lifting People | ||
SP1 Self-lifting work platforms on columns | ||
SP2 Construction site elevators and hoists | ||
SP3 Fruit picking wagons | ||
SP4 Manual variable inclination aerial ladders | ||
SP5 Motorized variable inclination aerial ladders | ||
SP6 Manually operated vertically deployable mobile bridges | ||
SP7 Motorized Developable Mobile Bridges | ||
SP8 Manual or motorized suspension bridges | including the related winches | |
GVR Gas Group Work Equipment | Steam | Heating |
Gas and water vapor containers with Volume (liters) x pressure (bar) | ||
GVR1 up to 1000 | ||
GVR2 over 1000 up to 8000 | ||
GVR3 over 8000 up to 27000 | ||
GVR4 over 27000 up to 125000 | ||
GVR5 over 125000 up to 143000 | ||
GVR6 over 143000 up to 729000 | ||
GVR7 over 729000 up to 1331000 | ||
GVR8 over 1331000 up to 2197000 | ||
GVR9 over 2197000 up to 3375000 | ||
GVR10 over 3375000 up to 4913000 | ||
GVR11 over 4913000 up to 5832000 | ||
GVR12 over 583200 | ||
Steam generators with heated surface up to 300 m2 | ||
GVR13 heated surface up to 113 m2 | ||
GVR14 heated surface over 113 up to 197 m2 |
GVR15 heated surface over 197 up to 300 m2 | |
Steam generators with heated surface over 300 m2 | |
GVR16 productivity� up to 12 t/h | |
GVR17 producibilit� da 12 t/h a 22 t/h | |
GVR18 productivity� from 22 t/ha to 37 t/h | |
GVR19 productivity� from 37 t/ha to 60 t/h | |
GVR20 productivity� from 60 t/ha to 90 t/h | |
GVR21 productivity� from 90 t/ha to 132 t/h | |
GVR22 producibilit� da 132 t/h a 186 t/h | |
GVR23 productivity� from 186 t/ha to 255 t/h | |
GVR24 productivity� from 255 t/ha to 342 t/h | |
GVR25 productivity� from 342 t/ha to 448 t/h | |
GVR26 producibilit� da 448 t/h a 579 t/h | |
GVR27 producibilit� da 579 t/h a 735 t/h | |
GVR28 producibilit� da 735 t/h a 921 t/h | |
GVR29 productivity� from 921 t/ha to 1141 t/h | |
GVR30 producibilit� da 1141 t/h a 1397 t/h | |
GVR31 productivity� over 1397 t/h | |
Pipes | |
GVR32 Each pipe to be subjected to inspection (DM 329 of 01/12/2004 and Annex VII of Legislative Decree 81/08 and subsequent amendments) | |
Central heating systems using hot water under pressure with water temperature not exceeding the boiling point at atmospheric pressure | having a global fireplace potential greater than 116 kW |
GVR33 Heating systems over 116 kW | |
SC Group Work Equipment - Non-hand-operated material lifting and centrifugal force hydroextractors | |
SC1 Self-propelled trolleys with fixed telescopic arm | |
SC2 Self-propelled trolleys with fixed telescopic arm equipped with one or more interchangeable attachments that provide the function of lifting materials with load suspension |
SC3 Self-propelled trolleys with fixed telescopic arm equipped with one or more interchangeable attachments that provide the function of lifting people | |
SC4 Self-propelled trolleys with fixed telescopic arm equipped with one or more interchangeable attachments that provide both the function of lifting materials and lifting people | |
SC5 Self-propelled telescopic swing arm trolleys | |
SC6 Self-propelled telescopic swing arm trucks equipped with one or more interchangeable attachments that provide the function of lifting materials with load suspension | |
SC7 Self-propelled trolleys with rotating telescopic arm equipped with one or more interchangeable attachments that provide the function of lifting people | |
SC8 Self-propelled trolleys with rotating telescopic arm equipped with one or more interchangeable attachments that provide both the function of lifting materials and lifting people | |
SC9 Continuous charge hydroextractors (operation check) | |
SC10 Discontinuous charge hydroextractors (operation check) | |
SC11 Hydroextractors with flammable solvents (operational verification) | |
SC12 Continuous charge hydroextractors (verification with machine disassembled) | |
SC13 Discontinuous charge hydroextractors (check with machine dismantled) | |
SC14 Hydroextractors with flammable solvents (check with machine dismantled) | |
SC15 For each reserve basket (hydroextractors | |
SC16 Winch and Hoist | |
SC17 Limited structure crane up to 500 kg (flag | shelf) |
SC18 Limited structure crane over 500 kg (bracket flag) | |
SC19 Overhead crane up to 1,000 kg | |
SC20 Overhead crane up to 10 t | |
SC21 Overhead crane over 10 t | |
SC22 Fixed or swing arm gantry crane up to 10 t | |
SC23 Fixed or swing arm gantry crane over 10 t | |
SC24 Gantry Crane | |
SC25 Gru a torre | |
SC26 Gantry crane for construction | |
SC27 Gru derrik | |
SC28 Fixed or swing arm crane mounted on truck up to 3 t | |
SC29 Fixed or swing arm crane mounted on truck over 3 t | |
SC30 Truck cranes and similar up to 10 t | |
SC31 Autogru and the like from 10 to 50 t |